Data Centers in Florida: Every Major Market Compared
Last updated: August 2026
Florida has more than 100 data centers spread across roughly 19 markets, but only four of them matter to most buyers: Miami, Tampa, Orlando and Jacksonville. Those four hold the overwhelming majority of the state’s commercially available colocation space, and they are not interchangeable — each one exists for a different reason, and picking the wrong one is the most expensive mistake in a Florida site search.
A second story is running alongside the first. The AI buildout has put Florida on the map for projects far larger than anything the state’s colocation markets have ever built, measured in hundreds of megawatts rather than tens. Those campuses are inland, they are mostly not yet operating, and they answer a different question than the one a colocation buyer is asking. This guide covers both, and keeps them separate.
Florida’s data center markets at a glance
Counts below are approximate. Operators open, consolidate and rebrand facilities continually, and published market boundaries differ from source to source — treat these as the shape of the state rather than an inventory.
| Market | Facilities | What it is known for |
|---|---|---|
| Miami | About 27 | The state's interconnection capital and the gateway to Latin America |
| Tampa | About 28 | West-coast hub; inland, out-of-evacuation-zone disaster recovery |
| Orlando | About 12 | Mid-sized enterprise and content, sold as Miami-adjacent |
| Jacksonville | About 11 | Second subsea gateway; a Miami-diverse route to Latin America |
| Boca Raton | About 5 | Cable landing stations, distinct from the Miami-Dade entry point |
| Tallahassee | About 4 | Small public-sector market serving government and education |
| Fort Lauderdale | About 4 | Broward colocation adjacent to the Miami ecosystem |
| West Palm Beach | About 3 | Northern edge of the South Florida corridor |
| Smaller markets | The remainder | Roughly 19 Florida markets in total, most with one or two facilities |
Miami: the state’s interconnection capital
Miami is the only Florida market whose value comes from what it connects to rather than what it contains. The subsea cable systems linking North America with Latin America and the Caribbean come ashore in South Florida and backhaul into downtown Miami, where the NAP of the Americas concentrates more than 160 carriers and service providers in a single carrier-neutral building. That density is why a network serving users in Bogotá, Lima, Santiago or São Paulo is far better off in Miami than in Virginia or California, and it is the reason the market exists at the scale it does.
The tradeoff is cost. Downtown interconnection carries a premium, and if what you need is thirty cabinets of general compute with ordinary transit, you will pay for an advantage you are not using. A common pattern is to split the two: a small network presence in a carrier hotel for peering and cloud on-ramps, with bulk compute in a cheaper facility connected back over metro fiber.
This site tracks twelve Miami-area facilities in depth — tier rating, power, cooling, hurricane hardening, compliance and carrier count for each. Start with the facility directory if you want to read the sites one at a time, or the comparison tool if you would rather filter them side by side on the specifications that matter to your deployment.
Tampa: the disaster recovery market
Tampa is Florida’s west-coast colocation hub, and it functions largely as an in-state disaster recovery and second-site market. The differentiator operators sell there is geography: inland siting, outside mandatory evacuation zones, far enough from Miami that a single storm is unlikely to take both sites out.
Centersquare’s TPA1 campus is the clearest expression of the pitch. It sits eight miles east of downtown Tampa and outside mandatory evacuation zones, with 19,245 sq ft of raised floor, 9 MW of utility capacity matched by 9 MW of generator capacity, 2.5 MW of UPS, chilled-water cooling and eleven carriers in a carrier-neutral meet-me room. It carries SOC 1 and SOC 2 Type II, PCI-DSS, ISO 27001 and NIST 800-53 certifications.
Hivelocity’s Tampa 1 makes the same argument from further out. The facility is 15,000 sq ft of raised floor at 8010 Woodland Center Blvd, seventeen miles inland, with N+1 battery UPS, 260 tons of N+2 CRAC cooling, diesel generators carrying five days of fuel runtime, a roof rated to 135 mph winds, and private peering with more than 300 networks. Flexential also operates colocation in the Tampa market and is worth including in any shortlist there.
Orlando: the Miami-adjacent alternative
Orlando is a mid-sized enterprise and content market, and its operators position it explicitly as an alternative to Miami rather than a competitor to it. The tell is that both anchor facilities sell connectivity that routes back south — the pitch is Orlando economics with Miami reach.
CoreSite, an American Tower company, operates OR1 at 9701 S. John Young Parkway: more than 129,000 sq ft with over 20 networks on campus, 140-plus digital ecosystem partners, ten or more cloud offerings through CoreSite’s Open Cloud Exchange, and internet exchange access reaching toward South America.
HostDime runs a 25,000 sq ft Tier III-certified carrier-neutral facility with dual redundant fiber feeds, close to 100 Gbps of redundant fiber capacity, and private dark fiber running to Miami and the NAP of the Americas. The company is also building a new 100,000 sq ft seven-story headquarters facility in Maitland for more than 1,000 racks, with Category 5 hurricane-rated construction, expected complete in Q3 2026.
Jacksonville: the second subsea gateway
Jacksonville is the market most buyers overlook and the one with the most interesting network story. It is Florida’s second subsea gateway and the state’s main Miami-diverse route to Latin America, which means a customer can build an express path south without traversing Miami at all. For anyone whose risk model treats South Florida as a single point of failure, that is the whole argument.
Cologix anchors the market with two connected sites. JAX1 is an 11,000 sq ft interconnection facility at 421 West Church Street in the central business district with more than 30 unique networks in its meet-me room; Cologix describes it as having access to two separate submarine cable systems reaching Central America, South America and the Caribbean. JAX2 is the scale counterpart — 125,000 sq ft of hurricane-rated colocation and disaster recovery space with 2N UPS, N+1 generators, 8-plus networks in the meet-me room, and access to more than 40 carriers over a dark fiber ring back to JAX1.
EdgeConneX operates a smaller edge site in the market: a 17,570 sq ft facility within five miles of downtown, supporting more than 20 kW per cabinet with N+1 redundancy throughout.
Tallahassee: the public-sector market
Tallahassee is small and mostly public sector. It is anchored by the Northwest Regional Data Center, a unit of Florida State University serving government and education customers. NWRDC is purpose-built, sits 88 feet above sea level, is protected to Category 4 hurricane strength, runs generators able to sustain full capacity for weeks, and offers CJIS-approved space. Its sister site, NWRDC-Southwood, is a Tier III certified 32,000 sq ft facility.
The carrier-neutral commercial option is EdgeConneX TAL01, an 11,810 sq ft purpose-built edge facility established in 2014 six miles from downtown, supporting more than 20 kW per cabinet with N+1 power and cooling redundancy. If your requirement is commercial colocation rather than state or education workloads, Tallahassee is a thin market and one of the four larger ones will usually serve you better.
Florida’s subsea cable landings
Florida’s position in the global network is not a matter of how many buildings it has. It is a matter of where the cables come ashore, and they come ashore in three places.
The Miami area is the primary Latin America gateway, anchored by the NAP of the Americas as the interconnection point where those cables’ terrestrial backhaul converges. Boca Raton hosts multiple cable landing stations, including the Telxius station serving SAm-1, CFX-1, GlobeNet and the Bahamas Internet Cable System — a second South Florida entry point genuinely distinct from Miami-Dade, which matters if your diversity requirement is written at the county level rather than the building level. Jacksonville is the northern gateway: access to two separate submarine cable systems reaching Central America, South America and the Caribbean per Cologix, plus a Jacksonville Beach branch of the CONFLUENCE-1 domestic East Coast system.
The practical takeaway is that true route diversity out of Florida is available but has to be designed for. Two facilities in Miami-Dade are not diverse from each other in any meaningful sense once the traffic reaches the subsea layer. Pairing South Florida with Jacksonville is.
The AI buildout
The projects making news in Florida are an order of magnitude larger than the state’s existing colocation stock, and they are inland. Atlas Compute secured land and utilities in Fort Pierce in November 2025 for a 240 MW liquid-cooled GPU-oriented campus engineered for 100 kW per-rack density, with expansion capacity to 1 GW, targeting operational readiness in Q4 2026 to Q1 2027. In Polk County, the Stonebridge project in Fort Meade received zoning approval and a 20-year development agreement in April 2026 for a proposed 200-acre hyperscale campus on a 1,300-acre site that would require 1.2 GW of electricity using closed-loop cooling; the operator has not been disclosed.
Florida’s legislative response is SB 484, effective July 1, 2026, which defines a large-scale data center as a single location with an anticipated monthly peak load of 50 MW or more and requires those customers to pay their full cost of service so utilities cannot shift it onto residential and small-business ratepayers. The threshold is the useful thing to remember: the inland campuses fall far inside it, while ordinary colocation facilities across the state fall far below it.
Miami’s AI capacity arrives in a different form. Metrobloks has acquired land at 500 NW 137th Avenue in Miami-Dade for a 112,900 sq ft, 15.2 MW multi-tenant AI-ready facility designed to Tier III standards, with rack densities from 5 kW to more than 150 kW, hybrid air-and-liquid cooling and 0.21 ms latency to the NAP of the Americas, targeting a Q4 2026 launch. Iron Mountain MIA-1 is the other — 150,000 sq ft and 16 MW, GPU-ready, opening mid-2026 per Iron Mountain. Both are mid-sized colocation buildings rather than training campuses, which is the whole distinction. Our guide to AI data centers in Miami covers the Miami projects, the county zoning debate and what any of it means for a buyer in detail.
South Florida beyond Miami
The South Florida corridor runs north from Miami-Dade through Fort Lauderdale, Boca Raton and West Palm Beach, adding roughly a dozen more facilities to the region. They are worth knowing about for two reasons: Boca Raton is a subsea entry point in its own right, and the Broward and Palm Beach sites often price below downtown Miami while staying within metro fiber reach of it. Our South Florida data centers guide covers the corridor market by market.
Frequently asked questions
How many data centers are in Florida?
More than 100, spread across roughly 19 distinct markets. Four of those markets account for most of the commercially available colocation space: Tampa with about 28 facilities, Miami with about 27, Orlando with about 12 and Jacksonville with about 11. The remaining markets are small, typically holding one to five facilities each. Treat every count as approximate — operators open, consolidate and rebrand sites continually, and different sources draw market boundaries differently.
Which Florida city has the most data centers?
Tampa and Miami are close enough that the answer depends on where you draw the market boundary — Tampa has about 28 facilities and Miami about 27. On facility count they are effectively tied. On importance to the network they are not: Miami is where the subsea cables serving Latin America converge and where the NAP of the Americas concentrates more than 160 carriers and service providers in a single building, while Tampa functions largely as an in-state disaster recovery and second-site market.
Where do subsea cables land in Florida?
Three areas. The Miami area is the state's primary Latin America gateway, anchored by the NAP of the Americas. Boca Raton hosts multiple cable landing stations, including the Telxius station serving SAm-1, CFX-1, GlobeNet and the Bahamas Internet Cable System, which makes it a second South Florida entry point distinct from Miami-Dade. Jacksonville is the state's northern gateway: Cologix describes its facilities there as having access to two separate submarine cable systems reaching Central America, South America and the Caribbean, and a branch of the CONFLUENCE-1 domestic East Coast system lands at Jacksonville Beach.
Why are so many data centers being built in Florida?
The current wave is driven by demand for AI compute, and Florida offers what those projects need most: large inland parcels and access to power. The proposals now in development are far larger than anything the state's colocation markets have built before — a 240 MW liquid-cooled GPU campus in Fort Pierce with expansion capacity to 1 GW, and a proposed 200-acre hyperscale campus in Fort Meade that would require 1.2 GW of electricity. Miami's own AI projects are much smaller because the county has expensive, fragmented industrial land and sits at the end of the state's transmission network.
Does Florida regulate large data centers?
Yes, as of 2026. Florida's SB 484 takes effect on July 1, 2026 and defines a large-scale data center as a single location with an anticipated monthly peak load of 50 MW or more. Those customers must pay the full cost of serving them, so utilities cannot shift that cost onto residential and small-business ratepayers. The threshold matters when you are evaluating a site: the gigawatt-class inland campuses fall well inside it, while typical colocation facilities in Miami, Tampa, Orlando and Jacksonville fall well below it.